
Roller Coaster Challenge
Engineer, construct, and ride our thrilling team-built roller coaster!
Group Size
Duration
Setting
This activity challenges the team to ideate, design and build an actual roller coaster that leverages gravity to transport a ball across the length of its rickety frame. Every twist & well crafted jump that makes the ball experience higher Gs will add to the exhilaration and be rewarded with points.
Key Focus Areas
- Diffuse Stress
- Collaboration
- Cross Team Collaboration
- Creativity
- Strategy/Planning
- Problem Solving
- Critical Decision Making
- Fun/Play
Teams conceptualize, design, and construct a gravity-powered roller coaster capable of transporting a ball smoothly across its structure. Participants must plan track design, test stability, and refine momentum flow to maximize performance. Success depends on engineering precision, creative problem-solving, calculated experimentation, and seamless collaboration under defined time constraints.




